When to use this playbook
- You are preparing a foreign facility for its first commercial sale or shipment into the United States.
- You are unsure whether the U.S. Agent, facility registration, product listing, label review, or Prior Notice comes first.
- You already have a DUNS number but do not know whether it is sufficient for your FDA filing.
- You have not selected a U.S. distributor and are concerned that registration must wait.
- You have no dedicated regulatory employee and need a sequence that can be assigned to an operations lead.
What success looks like
Your facility reaches confirmed registration status in the correct FDA system, the required product-level records are connected to it, the U.S. Agent has accepted the designation, and the label is ready before the first commercial shipment.
A U.S. distributor is not a prerequisite for starting FDA registration. Device and drug filings ask for known importer information, but a signed distributor agreement is not a universal registration gate. For food, the FSVP importer is also a separate role from the distributor and U.S. Agent. The distinction is explained in FSVP Importer vs FDA U.S. Agent.
The four FDA filing orders side by side
| Vertical | What must exist before registration | U.S. Agent timing | First FDA filing and system | When product listing follows | Label and first-shipment timing |
|---|---|---|---|---|---|
| Food and beverage | FURLS account, facility data, authorization to file, and a DUNS number whose legal name and address match the facility. | Choose the agent before filing and enter the agent in the registration. FDA does not issue the registration number until the agent accepts. The agent has 30 calendar days to respond. | Submit food facility registration through the Food Facility Registration Module, commonly called FFRM. | There is no general FDA product-listing filing for ordinary food. Facility registration is followed by shipment and importer requirements. | Review the label before printing or shipping. Submit Prior Notice close to each shipment, after the facility has a valid registration. |
| Cosmetics | Facility FEI number, owner or operator information, U.S. Agent details, facility brand names, and the data needed for the registration. DUNS appears in Cosmetics Direct but FEI is the required facility identifier. | Enter the U.S. Agent in the foreign facility registration. The U.S. Agent and the MoCRA Responsible Person are different roles. | Submit the facility registration through Cosmetics Direct or an accepted SPL route. A new facility must register within 60 days after first engaging in manufacturing or processing for U.S. distribution. | The Responsible Person submits the cosmetic product listing within 120 days after the product is first marketed, then updates it annually. | Resolve ingredients, claims, warnings, and English-language labeling before marketing and preferably before the first shipment. Do not use the 120-day listing window to postpone label review. |
| Medical devices | Device classification, required premarket authorization, FURLS owner or operator account, annual FDA user-fee payment, PIN and PCN, product code, and U.S. Agent details. | Enter the agent during FURLS/DRLM registration. FDA sends an automated acceptance request, and a non-response within 10 business days requires a replacement agent. | Pay the FDA establishment fee first, then register through FURLS and the Device Registration and Listing Module, or DRLM. | Create the device listing during the initial registration workflow. GUDID submission is a separate product-data step when UDI requirements apply. | Complete classification and label review before the first shipment. Finalize UDI data before the relevant GUDID submission. |
| Drugs and pharmaceuticals | A lawful marketing pathway, establishment DUNS number, official contact, U.S. Agent name and DUNS, known importer information, and an SPL submission method. | Designate one U.S. Agent and include the agent in establishment registration before the drug is offered for import. | Submit an establishment registration SPL through FDA Direct or another FDA-accepted SPL route. | Obtain a labeler code before product listing. Submit the initial NDC drug listing within three days after establishment registration. | Complete label review before product listing because the SPL includes current labeling and package images. Registration and listing must be complete before import. |
The underlying FDA sequences are documented in the agency’s food-facility instructions, cosmetics registration guidance, device registration instructions, and drug establishment instructions.
1. Classify the product before opening a registration
Action: Identify whether the product is food, a dietary supplement, a cosmetic, a medical device, a drug, or a combination product. Review the intended use, ingredients, claims, manufacturing operations, and label language, not just the name used in your home market.
Expected outcome: You know which FDA center, portal, registration type, product-listing rule, and labeling framework apply.
Gotcha: Filing in the wrong category creates more work than delaying the filing long enough to classify correctly. Anti-acne, hair-growth, pain-relief, disease-prevention, and body-function claims can move an apparent cosmetic into drug regulation. Device classification can also determine whether a 510(k), De Novo, or PMA must precede listing.
Planning time: Classification can be completed quickly when the formula, intended use, and claims are settled. Treat unresolved cosmetic-versus-drug or device-classification questions as a pre-filing workstream rather than a portal problem.
2. Match the facility identity to the correct FDA identifier
Action: Build one controlled facility record containing the legal name, physical address, parent company, owner or operator, contact details, trade names, manufacturing activities, and identifiers. Check every character of the address against the identifier record.
Expected outcome: The FDA submission and the underlying identifier refer to the same physical facility, reducing validation errors and duplicate records.
Gotcha: A headquarters DUNS number is not a substitute for the manufacturing establishment’s DUNS number. Food registration currently uses DUNS as FDA’s accepted Unique Facility Identifier. Cosmetic facility registration instead requires an FDA Establishment Identifier, or FEI, before submission.
Planning time: Identifier issuance and correction are controlled by Dun & Bradstreet or FDA, not by the filing provider. Start this step before committing to a shipment date.
3. Appoint the U.S. Agent before submitting the foreign facility
Action: Select the U.S. Agent, obtain the correct legal name and contact information, and confirm that the agent is ready to accept the designation promptly. Use the agent information in the initial facility or establishment registration.
Expected outcome: The registration contains a responsive U.S.-based FDA contact from its first submission.
Gotcha: Submission is not always the end of the agent step. Food registrations remain unconfirmed until the agent accepts, with a 30-calendar-day response window. Device agents receive an automated request and must respond within 10 business days. A U.S. Agent should not be confused with a distributor, customs broker, medical-device initial importer, food FSVP importer, or cosmetic Responsible Person.
Planning time: FDA Entry Point confirms and submits a completed registration update within one business day once the required information is available. FDA validation, acceptance messages, identifier corrections, and portal processing remain outside the company’s control. See the FDA Entry Point compliance process.
4. Submit the facility or establishment registration
Action: File in the category-specific system rather than searching for a single universal “FDA registration” form.
- Food: Food Facility Registration Module in FDA Industry Systems.
- Cosmetics: Cosmetics Direct or another accepted SPL submission route.
- Medical devices: FURLS and DRLM after the annual FDA establishment fee has been processed.
- Drugs: Establishment registration SPL through FDA Direct or another accepted SPL submission route.
Expected outcome: You retain the FDA-generated submission record and can distinguish submitted, pending, accepted, and active status.
Gotcha: Registration does not mean FDA approval. FDA does not charge a government submission fee for food facility registration or MoCRA cosmetic registration and listing. Medical-device establishments must pay the annual FDA registration user fee before completing registration.
| Registration | Known timing control | What can extend the timeline |
|---|---|---|
| Food | The U.S. Agent has 30 calendar days to answer FDA’s verification request, but should respond immediately. | DUNS mismatches, incorrect agent email, rejected designations, and incomplete facility fields. |
| Cosmetics | FDA publishes filing deadlines but no universal processing-time guarantee. | Missing FEI, facility duplication, ingredient-data issues, or incomplete product information. |
| Medical devices | FDA states that PIN and PCN processing typically takes several days. The agent then has 10 business days to accept. | Payment processing, unresolved classification, missing premarket numbers, or agent non-response. |
| Drugs | After successful establishment-registration submission, the facility should appear in FDA’s registration database by the end of the next business day. | SPL validation errors, DUNS discrepancies, labeler-code work, or incomplete importer information. |
5. Complete the product-level filing on its own clock
Action: Do not assume the facility registration automatically covers the products manufactured there.
- Food: Ordinary food does not have a general FDA product-listing step. Move to labeling, importer readiness, and Prior Notice.
- Cosmetics: The Responsible Person submits a listing for each cosmetic product within 120 days after first marketing and updates the listing annually.
- Medical devices: List each applicable device during the initial DRLM workflow. Complete separate UDI and GUDID work when required for the device.
- Drugs: Obtain the labeler code, assign the proposed NDC, and submit the drug-listing SPL within three days after initial establishment registration.
Expected outcome: The facility and its products are connected through the correct FDA records.
Gotcha: Facility registration and product listing are separate obligations, even when the portal presents them in one workflow. The practical differences are mapped in FDA Facility Registration vs Product Listing. FDA’s drug instructions require a labeler code before listing and set the three-day initial-listing sequence.
6. Finish label review before the label becomes expensive to change
Action: Review the U.S. label after classification but before final printing, packaging production, marketplace upload, or shipment. Check the product identity, ingredient terminology, net quantity, responsible firm information, required warnings, directions, claims, and country-of-origin treatment.
Expected outcome: The label matches the product’s U.S. regulatory category and the data used in its product listing or SPL.
Gotcha: FDA generally does not pre-approve food or cosmetic labels. Responsibility remains with the manufacturer or marketer, and an incorrect claim can change the product’s regulatory category. Imported cosmetics must meet the same labeling rules as U.S.-made cosmetics.
Planning time: Complete the review before committing to production quantities. Drug labels should be final before the product-listing SPL because current labeling and package images are part of the submission.
7. Add shipment-specific requirements only after the base records work
Action: For food, identify the importer and customs-filing workflow, confirm the valid facility registration number, and submit Prior Notice for each covered shipment. Prior Notice can be filed by a manufacturer, exporter, importer, broker, U.S. Agent, or another person with the required information.
Expected outcome: The shipment reaches the port with a confirmed Prior Notice tied to accurate facility and product information.
Gotcha: Prior Notice does not replace food facility registration. FDA must receive and confirm it before arrival, with minimum lead times of two hours by road, four hours by rail or air, and eight hours by water. A filing through FDA’s PNSI cannot be submitted more than 15 calendar days before anticipated arrival. See the fuller FDA Prior Notice playbook.
Planning time: Prior Notice is a shipment-stage filing, not a market-entry filing to complete months in advance.
8. Save accepted evidence and calendar the next filing
Action: Retain the accepted submission, registration or owner-operator number, listing numbers, agent acceptance, SPL acknowledgments, Prior Notice confirmations, portal exports, and the credentials needed to update each record.
Expected outcome: Your team can prove what was filed, update the correct record, and avoid creating duplicate accounts or registrations.
Gotcha: A provider-issued registration certificate is not an FDA approval. Cosmetics Direct explicitly states that FDA does not issue certificates to verify cosmetic facility registration or product listing. Renewals also follow different clocks: food is biennial in even-numbered years, cosmetics is biennial from initial registration, and device and drug registrations renew annually.
Planning time: Add renewal dates to the compliance calendar immediately after acceptance, not when a distributor asks for updated proof.
What the first filing sequence costs through FDA Entry Point
These examples use published starting prices reviewed on October 16, 2026. They are arithmetic planning examples, not bundled quotes. Annual agent coverage, facility filings, per-product listings, label reviews, government fees, and shipment filings have different billing and renewal triggers.
| Vertical | Illustrative first-product scope | Starting planning total | Not included |
|---|---|---|---|
| Food and beverage | $295 annual U.S. Agent, $249 facility registration, $349 basic or $600 standard label review, and one $30 Prior Notice filing. | $923 with basic label review or $1,174 with standard review. | $95 DUNS application if needed, additional products, additional shipments, FSVP work, and customs-broker charges. |
| Cosmetics | $295 annual U.S. Agent, $449 facility registration, $299 for one product listing, and $449 for one label review. | $1,492. | Additional products, reformulations, safety substantiation work, and separately scoped Responsible Person support. |
| Medical devices | $395 annual U.S. Agent, $349 establishment-registration service, $50 for one device listing, and $449 for one label review. | $1,243 plus the FDA establishment user fee. | FDA government fees, premarket submissions, classification work, additional devices, and GUDID/UDI work. |
| Drugs and pharmaceuticals | $395 annual U.S. Agent, $449 establishment registration, $299 for one NDC product listing with SPL included, and $449 for one label review. | $1,592. | Additional products, standalone SPL revisions, application work, testing, and product-specific regulatory strategy. |
Frequently asked questions
What is the very first FDA filing for a new foreign manufacturer?
The first FDA filing depends on the product category. Food and cosmetic manufacturers begin with facility registration after securing the required identifier and U.S. Agent. Medical-device manufacturers first pay the annual FDA establishment fee, then complete registration and device listing through FURLS/DRLM. Drug manufacturers submit an establishment-registration SPL before filing the product listing. In every category, classification, facility identity, and U.S. Agent selection come before pressing submit.
Do I need FDA registration before or after finding a U.S. distributor?
You can begin and usually complete FDA registration before appointing a U.S. distributor. A distributor is not the same as a U.S. Agent, medical-device initial importer, drug importer, or food FSVP importer. Device and drug records require known importer information, but FDA’s instructions do not make a distributor contract a universal prerequisite. Starting registration early is usually more practical than making a distributor wait while identifiers, agent acceptance, or portal errors are resolved.
How long does FDA registration take for a brand-new foreign facility?
There is no single FDA registration timeframe across all four verticals. FDA Entry Point can confirm and submit a complete registration update within one business day, but it cannot control DUNS or FEI corrections, FDA validation, agent-verification messages, or government payment processing. Medical-device PIN and PCN processing typically takes several days. A successfully submitted drug registration should appear in FDA’s database by the end of the next business day. Food registration remains pending until the U.S. Agent accepts.
Does a Chinese manufacturer follow a different FDA registration sequence?
No, a Chinese manufacturer follows the same FDA sequence as another foreign manufacturer in the same product category. The controlling questions are what the product is, what the facility does, whether premarket authorization is required, and which importer and agent roles apply. A Chinese food facility therefore follows the food sequence, while a Chinese device manufacturer follows FURLS/DRLM and any applicable premarket pathway. Tariffs and trade remedies are separate from FDA registration.
What FDA steps apply to an Indian pharmaceutical exporter?
An Indian pharmaceutical exporter must establish the drug’s lawful U.S. marketing pathway, obtain the correct facility DUNS number, appoint one U.S. Agent, and register the foreign establishment through an SPL submission before offering the drug for import. The company then needs a labeler code and must submit the initial NDC drug listing within three days after registration. The listing includes current labeling and package images, so label review belongs before the listing submission. Drug registration and SPL support for foreign manufacturers explains the continuing workflow.
Should a food exporter file Prior Notice before facility registration?
No. Complete and confirm the food facility registration first, then submit Prior Notice when the shipment details and arrival timing are known. The Prior Notice filing uses facility and shipment information and must be confirmed before the food reaches the U.S. port. Treating Prior Notice as the first market-entry filing leaves the underlying facility record unresolved and can create preventable entry problems.
References
- FDA Entry Point pricing
- FDA Entry Point U.S. Agent and compliance services
- FDA food-business and facility-registration instructions
- FDA food-facility registration questions and answers
- FDA Prior Notice guidance
- FDA cosmetic facility registration and product listing
- FDA medical-device registration and listing instructions
- FDA medical-device U.S. Agent requirements
- FDA drug establishment registration instructions
- FDA drug-listing instructions